The outdoor kitchen


Moving in in October 2022, my indoor kitchen redone is completed on Jan 13, 2023, except the backsplash tiles. The outdoor kitchen becomes my next project. From our initial contact of two contractors in October 2022 to installation on Feb 24, 2023 with one do over, it took four months. The backsplash tiling is done on March 8.

Here is our outdoor kitchen’s journey:

Step 1: Shop for a contractor

Oct 28, 2022, we started to visit the out door kitcheners, the two companies that we got referrals for. After initial contact, we found them to be very unresponsive – It took a week or so for a reply.

What do we want? A basic strip with a grill, a sink, a refrigerator and cabinets. At first, I wanted a separate stove/burner, then decided to do without


Leave a Reply